Launch Prep
02 November 2015 | Grenada Marine
Last minute prep before Baruna gets launched tomorrow includes bottom paint, waxing the topsides, applying Prop Speed and finishing some fiberglass repair work in the cockpit. Previously, the steering collar for the rudder post was removed and shaved to fit better, and Louis rebuilt the hydraulic backstay tensioner, rebedded the genoa tracks and installed aluminum backing plates for the tracks.