OK – if you’ve been wondering what we did in our three (long!) months at Shelter Bay here is a breakout: New: AB dink, dink chaps, Yahama 15 hp 2 stroke outboard, 2 anchors, 300’ anchor chain, Lofrans Tigres windlass, Jabsco head, stainless handrail, two hanging closets converted to shelved pantries, bottom job, Kiwi prop, Engel freezer, VHF fixed radio, black rubber toerail rubrail, one solar panel, and additional 12v and 110 outlets.
Projects: VHF radio mast cable replaced (thank you Steve for your help!), boat compounded and waxed, life raft moved back to cabin top, a dozen sewing projects, bow pulpit stainless straightened and strengthened, Sirena makeover, anchor locker pipe reconfigured, re-bedded chainplates and tuned rigging, refinished black easypoxy toerail, engine and generator oil and filters changed, toolbox and tool bags cleaned out and organized (guess who did that chore??).