SailBlogs
Bookmark and Share
SailBlog
Happy Easter
Jules
05/04/2012

Well, two out of, how many(?) isn't bad.

We finally got the new generator on board and down in the engine room. Then the tool chest had to be taken out and the radiator had to come off the Lister so that it could be put in position. Which Mike, with the help of Tony and Rudi, did by floating it across the engine room on chain blocks. Mike then had to cut a hole through the deck-head of the engine room to attach the new exhaust ... no longer will we have water coming in and flooding engines, apparently.

So it's now installed and running, which is wonderful. It's not quite as quiet, or vibration free, as we would have hoped but at least it works!

We had to have Spanny the welder back for a couple of days to weld the exhaust on deck and a few other odds and sods, like welding up the passage-way door we never use and finally finishing off the overhead hatch on the bedsit door which has never worked anyway.

Unfortunately both the fridges we were trying to get fixed turned out to be NFG. Although we did find a small old one we'd had in the hold since leaving Maryport which works so at least we have something, and we've moved the beer fridge down nearer the galley so we can put food in there as well. So we are functioning on that front, even if not quite on all cylinders.

Mike did a much needed dinghy overall and stopped the leaks (it was like getting into a floating paddling pool every time we went anywhere). He also managed to get the Yamaha 8 hp outboard running so we've switched that for the gas guzzling 25 hp. It's frustratingly slow after the 25 but hopefully something that I can run once the initial teething problems have been sorted out.

There's still no news on the inverter, apparently the guy's waiting for parts, so lights out really does mean lights out (plus fan, and music, and anything else that needs power).

I've been going to the dentist at least a couple of times a week, including this morning, and am now on my fourth set of antibiotics but the infection still hasn't cleared and they can't refill my tooth until it does. With the last lot of antibiotics I developed oesophagitis which was particularly painful and worrying but which thankfully got slightly better once I started to take the Zantac ... I'm starting to feel a bit like a walking pharmacy which, after years of not having to take anything, is not a good feeling.

On another not very good note. Tony went to the hospital on Monday because he had a pain in his side and was feeling sick. It turns out he has a hernia. Being a typical Indonesian (and this really is a cultural thing) he thinks he's going to die (or at the very least never be able to have sex again). His first response was to want to go home, somewhat understandably I guess. Since then we've shown him videos and translated articles from the NHS website (thank God for the internet ... it really does have it's uses!), and we've also had Rudi talk to him about his experiences with hernias. He seems to have calmed down a little but is walking around feeling exceedingly sorry for himself. We'll go with him to the hospital after the holidays to talk to doctor about getting surgery done here, but ultimately if he wants to go we can't stop him ... well apart from the fact that he sent most of him money back to Indonesia already so doesn't have the airfare.

There was a fire on Hog Island last Monday night which was quite a blaze. It raged for well over ten hours and left a large part of the island under ash, but luckily it didn't make it down to Roger's Bar so that was ok. We also had some excitement yesterday when the customs came and impounded one of the local boats for drug-running and arrested the local drug baron.

Sorry it's not a particularly inspiring blog, oh well ... Wishing you all a Happy Easter, wherever you are and whatever you're doing.

Love to all ...

PS What's with all the weather ????

Back on the buoy
Jules
20/03/2012, Woburn, Grenada

So ... we finally finished our stint with the freighter, after five days at the dock. I was over at Port Louis Marina, pointedly not watching as they towed them off the dock. Just as well I wasn't watching as the steel hawser line broke and the pilot was going ballistic at the freighter crew who weren't paying attention. Later that evening we met the pilot, Lazarus, and his wife for supper at Port Louis and the service was so bad we ended up banning ourselves from ever going there again; it's not the first time we've done it but this time we definitely mean it.

Then on the Saturday morning I went to Angie's and Mike went out with the Buzzard to get fuel off Tobago and then head up to Carriacou. The weather wasn't in our favour though and they got a licking going back up.

People think that because we're a relatively big boat that we can handle the rough stuff, which on one level we can (or at least the Buzzard can), but it doesn't mean we don't roll, get green water over the wheelhouse and two foot deep on the side-decks, and have things flying all over the place. Mike said it was a good job I wasn't on board and I have to say I totally agree with him.

But, anyway, he got to Carriacou ok and spent the next few days working hard to try and sort out the mess that was our boat. I got the ferry up on the Thursday after my first root canal appointment, and the vomit comet most certainly lived up to its name that day. Mike was on the dock to meet me and was looking very un-Mike like, with the tiredness barely concealed beneath his multi-coloured (mainly white) salty sea-dog beard.

Of course instead of going back to the Buzzard we went to Tanya's boat for five hours to help her sort out more of her electric problems, so when we finally did get back it was about 9 o'clock and we were both over tired. Which didn't help my mood when I walked into our cabin to find that stuff was still all over the floor, we'd had a diesel leak in the hold, oh and the fridge wasn't working again, and on and on ..... welcome home!

We tried hard to have a somewhat relaxing weekend but that didn't quite pan out, mainly due to some fairly serious issues between Tanya and her partner Jason. I also had the job of sorting out our cabin and the saloon and realising we'd become very complacent about the amount of stuff we had that wasn't secured, and having to do a fairly major cull. Then I had to catch the ferry back on Sunday afternoon so I could be back for my next dental appointment on the Monday morning (for which I arrived on time and then had to wait two hours because the chair was broken).

Mike left Tyrell Bay at 6.30 am Tuesday and headed back down to Woburn. They were shadowing Don whose old wooden boat was drastically in need of a haul-out and who wasn't sure it would make it down to Grenada. We had the bridles, ropes and spare pumps ready but luckily everything went well and they weren't needed.

They were back on the mooring buoy by 2 pm but had managed to get water in our one functioning generator so he had to fix that before they could get the crane going to launch the dinghy. I think he finally made it into Sep's around 5.30 pm, and then we went to the yacht club to meet up with June and Jeff, only their outboard wouldn't start so that didn't happen, and now they're up in Carriacou so we still haven't managed to see them. Just hope they get to come back to Hog before June leaves next month.

The last week has a been spent trying to catch up on sleep and sorting out some of our myriad problems. The new generator is now on the island, after leaving Florida a week later than it should have done, and hopefully we'll be able to pick it up tomorrow. The Onan generator has been un-installed. The fridge broke, got fixed, and has stopped again. The awning split and we had to take it down and get it sown up because having no shade is not an option and the 'new' awning is nowhere near being installed. We had a problem with a leak in the sea-chest and salt-water was seeping into the fresh so that had to be taken apart and fixed. We still don't have a working inverter so we're down to torch light once the generator goes off, and the batteries aren't doing what they should either.

It's almost like there's just so many problems to fix at the moment that we don't know where to start. Luckily though we are beginning to catch up on sleep and the world is beginning to seem slightly more manageable. I had hoped that Mike and I could get away for a couple of days but that's not really an option until James gets back (hopefully soon), as Tony can't always start the generator. Although he has now got over his home-sickness, has decided he does want to stay with us (good job), and has become slightly more motivated.

I've now had four dental appointments but when I went yesterday the abscess still hadn't gone so I'm back on anti-biotics and they can't pack the tooth until it's cleared up. It's starting to hurt quite a bit too. On a positive note though I went and got my blood results from the hospital and I don't have AIDS, hepatitis or syphilis, so that's ok.

It's also so good to be back on our mooring and among friends, and the weather is finally starting to calm down, although considering we're officially in the dry season there's still an awful lot of rain around.

Tony went off on Saturday afternoon and spent the night with Devon so we had the boat to ourselves for a while which was wonderful. And we had some people over for brunch on Sunday and even managed a few hours on Hog Island in the afternoon. So normal life is starting to be resumed.

I'm hoping that the next blog will be all about how the new generator is up and running perfectly, the inverter has been fixed, the outboards are now working, the fridge is keeping the beer as cold as it should be and we've just had a wonderful three day stay at a luxury resort (that isn't Port Louis) ... anyone like to bet???

Love to all ...

Venezuelan Odyssey II
Jules
01/03/2012, St. George's, Grenada

I was wrong ... Mike did end up going back to Venezuela to pick up the other freighter. They left on Friday 17th Feb. after numerous phone calls and assurances that they would be able to leave Venezuela straight away.

They arrived in Margarita on the Saturday evening, tied up alongside the freighter, met the agent and officials, and were told they'd get clearance in the morning ... as soon as the drug squad had brought the sniffer dogs and underwater cameras on board and searched both boats.

They'd had a relatively good run down there. The 'only' issue on this leg being the Lister generator which went haywire and blew up the two fridges, the PC monitor and power pack, the laptop charger and the charger for the sat. phone. And the Yanmar turbo oil seal which leaked oil into the engine, ended up running away and nearly seized up. Apart from that all went well.

The drug squad were on board by 7.30 am Sunday, all 11 of them. Apparently the officers were fine but the young pups doing the search ended up taking a phone from James' cabin, which was in a box, in a holdall, in a cupboard under his bunk. They also took a watch and a pair of new sneakers from the freighter. (Mike's phone has also gone missing, which is causing no end of problems trying to contact people, only he thinks he had it after the Venezuelans left so we have no idea what's happened to that.)

By early afternoon the tow was underway with two of the freighter crew on board the Buzzard to augment Mike, James, Tony and Scott (an American friend who'd gone along to help). And they made fairly good progress, considering the freighter was twice our size and laden with 1,200 tonnes of cement, most of which was in the bow.

I got a sat. phone call saying all was well and they should be back in around 32 hours. Unfortunately, just past Los Testigos at 8 pm, the main oil-line on our Callesen sheared off. I can only imagine what that night was like. They were without power for 18 hours while Mike and James did what they could. Mike had to lower the dinghy and go alongside the other boat (in the dark, in 3m swells) to get the pipe brazed (which didn't work), and then again to get some hose and more oil to replace that which had sprayed round the engine room. (And the outboard got smashed on the crane bringing it back on board.)

Eventually it was fixed, during which time they'd drifted 40 miles in the wrong direction. At one point Scott said he was worried the freighter was going to hit the back of us because they continued going when we weren't. Of course I knew nothing of this until Mike called on the Monday to say all was fine again.

They eventually got in to Grenada on Wednesday at around 7.30 pm, I sat on Angie's balcony and watched them come over the horizon as the sun was setting. They anchored out alongside the freighter for the night and prepared to bring them in to the dock the next day. Only the swell was too big for cruise ships and they came into the dock instead, and then it was the weekend. So we spent the weekend on standby, which was just as well because they dragged on the Friday afternoon and we had to help them re-anchor.

First thing Monday Mike went back alongside them to bring them to the dock. And whilst they were pulling their anchor the chain snapped and they ended up having to leave the anchor there. Really does make you wonder about some of these boats.

While we were at the dock we got water and were then ready to leave and go back out to anchor, only apparently the Port Authority had other ideas. Because the freighter has no engine working we were required to stay tied alongside for the duration of the unloading in case of emergencies. The unloading was supposed to take 2-3 days. It's already been 3 and they've only just started the second hold, oh and it's raining so they can't work anyway. The noise and cement dust is really starting to get us, as is the throbbing generators from the container ship next door; makes it feel like we're back in Chaguaramas.

Not quite sure when they're going to be finished but it may be a bit of a problem because we need to leave on Saturday morning to go get more fuel and head up to Carriacou. The owner of the freighter has known about this prior commitment all along but nobody expected this part of the job to take so long ... although we really should know better by now.

Anyway, while the Buzzard was having adventures on the high-seas I stayed with Angie in her apartment over-looking Grand Anse beach, and tried not to be overly anxious. On the Sunday I went to Hog Island to say goodbye to some friends who were leaving for Trinidad, and to see June and Jeff, June's been back over three weeks and I've still only managed to catch up a couple of times. I was supposed to be having a quiet afternoon but Hog took hold, as usual, and I ended up staying on Tiempo with Pete.

The next day we sailed round to St. George's, had lunch at The Nutmeg and went to see a local art show. All so civilised ... wonder why Mike and I don't do things like that.

On the Wednesday the boys got back I went up to the local hospital to give blood as a friend of ours has been in for a couple of weeks and has needed several blood transfusions, and they're running low. There was quite a queue of yachties lining up to do the right thing, and apart from the mosquitoes in the room it was all relatively painless.

Last Friday I had to go to the dentist for a second opinion about my front tooth. Apparently this dentist could see something on the x-ray: I have an abscess which has been there a while and has been eating into the gum and loosening the tooth. Great. I'm on a course of strong anti-biotics and have a series of root canal appointments booked to start next week, lucky me.

In amongst all this we've been trying to repair damaged parts and services. We've replaced the relay and now have one fridge working, and we've bought new chargers for the laptops and the sat. phone. Mike's sourced and ordered a brand new 15kw generator which should be, fingers crossed, shipped from Florida at the weekend and be with us by the week after. Now all we have to do is move the tool box and one of the air-compressors, take out the Onan (which never did work), and build new brackets to mount it on.

Not sure what's happening with Tony since he got back from Indonesia. He hasn't seemed particularly motivated, almost to the point of laziness, and this morning has said he wants to return to Indonesia next month. Makes me wonder if his missing his flight wasn't an attempt not to come back at all. Only now we have to pay Julie for the extra flight she organised, and he wants us to spend another $2,000 sending him home again. After only working for us for a month, and sending $300 home already? Crew ...

So ... I guess that's enough for now. I've been a bit side-tracked from the new blog but will hopefully get back to working on it soon.

Love to everyone ....

Newer ]  |  [ Older ]