Kaimusailing

s/v Kaimu Wharram Catamaran

Vessel Name: Kaimu
Vessel Make/Model: Wharram Custom
Hailing Port: Norwalk, CT
Crew: Andy and the Kaimu Crew
About: Sailors in the Baltimore, Annapolis, DC area.
21 March 2024 | St. Marys, GA
01 March 2024 | St. Marys, GA
23 February 2024 | St. Marys, GA
15 February 2024 | St. Marys, GA
11 February 2024 | St. Marys, GA
06 February 2024 | St. Marys, GA
26 January 2024 | St. Marys, GA
14 January 2024 | St. Marys, GA
09 January 2024 | St Marys, GA
23 December 2023 | St Marys, GA
10 December 2023 | St Marys, GA
25 November 2023 | St. Marys, GA
17 November 2023 | St. Marys, GA
17 November 2023 | Somers Cove Marina, Crisfield, MD
03 November 2023 | Somers Cove Marina, Crisfield, MD
26 October 2023 | Somers Cove Marina, Crisfield, MD
17 October 2023 | Somers Cove Marina, Crisfield, MD
11 October 2023 | Somers Cove Marina, Crisfield, MD
04 October 2023 | Alice B. Tawes, McReady Pavilion, Crisfield, Maryland Eastern Shore
03 October 2023 | Alice B. Tawes, McReady Pavilion, Crisfield, Maryland Eastern Shore
Recent Blog Posts
21 March 2024 | St. Marys, GA

Just Add Water

The rainy weekend started off with overcast and fog but no rain. It looked like I might be able to get something done on the D4 dinghy. I wanted to change the bow seat which is really the bow deck. The sailing option uses the deck to hold the freestanding mast. I didn’t like how the deck looked, [...]

01 March 2024 | St. Marys, GA

D4 Dinghy Alternative Seats

The rain event was more wind than rain, strong winds with gusts up to 44 mph. We drove into town to see what the harbor was like. There was a small sailboat that had dragged anchor and was sitting close to shore. The tide was out. We left and played with Bleu at Notter’s Pond.

23 February 2024 | St. Marys, GA

D4 Inside Seams

Day two of the dinghy build started out with me finishing wiring the hull bottoms together on the centerline of the bottom panels. This was much easier than the wiring of the chine edges of the bottom panels and the side panels.

15 February 2024 | St. Marys, GA

D4 Dinghy Day One

A Wharram Pahi 26 had been anchored in the river nearby the boatyard and was hauled out with the travel lift. I went around to look at it and talked to the owner couple. I was surprised that it had been built in Martinique in 1988. The boat is more than 30 years old.

11 February 2024 | St. Marys, GA

D4 Redux

The inflatable (deflatable) dinghy I had bought was deteriorating. It had bottom seams separating. It is a West Marine branded dinghy made out of PVC. HH66 is the adhesive to reattach the seams. A friend had a similar problem and bought the same adhesive. I was waiting to hear from him how it worked [...]

06 February 2024 | St. Marys, GA

The Clincher

We decided to go to Amelia Island for the day, probably to the beach. Our plan to cycle around on the Raleigh 20’s seemed like a bad idea, Bleu can’t keep up with a bicycle for very long and when he quits he quits. So we would walk, where?, Fort Clinch State Park. She has a forever pass for Florida [...]

Port Rudder Build Up

10 April 2016 | St. Mary's, GA
Capn Andy/Clear and Mild
The starboard rudder was taken down with care to keep the cutlass bearings attached to the epoxy build up. The rudder pins were moved to the port hull and the port rudder was hoisted inot position. This rudder was more difficult to position because all its gudgeons had been broken. The top gudgeon was still there, but torn and flapping free. It had to be cut off and the area prepared for the build up.
.
The picture is of the rudder in position. The top is held in place by a line looping back from the bulwark, around the top of the rudder, then off to a winch on deck. The bottom was held up with a car jack and some pry bars, then 2X3‘s were clamped to the rudder and skeg to line them up exactly. The cutlass bearings were pinned with the rudder pins with plastic washers as bearings between the cutlass bearings and the hull gudgeons. Then the epoxy colloidal silica mix was troweled into the void between the cutlass bearings and the rudders. After that sets up, both rudders will have their cutlass bearings glassed over with 3 layers of roving.
Comments

About & Links

SailBlogs Groups