Kaimusailing

s/v Kaimu Wharram Catamaran

Vessel Name: Kaimu
Vessel Make/Model: Wharram Custom
Hailing Port: Norwalk, CT
Crew: Andy and the Kaimu Crew
About: Sailors in the Baltimore, Annapolis, DC area.
25 May 2017 | st marys, ga
17 May 2017 | st marys, ga
15 May 2017 | st marys, ga
15 May 2017 | st marys, ga
13 May 2017 | st marys, ga
13 May 2017 | st marys, ga
13 May 2017 | st marys, ga
07 May 2017 | St. Marys, GA
07 May 2017 | St. Marys, GA
27 April 2017 | St. Marys, GA
26 April 2017 | St. Marys, GA
24 April 2017 | St. Marys, GA
24 April 2017 | St. Marys, GA
23 April 2017 | St. Marys, GA
20 April 2017 | St. Marys, GA
19 April 2017 | St. Marys, GA
18 April 2017 | St. Marys, GA
16 April 2017 | St. Marys, GA
14 April 2017 | St. Marys, GA
13 April 2017 | St. Marys, GA
Recent Blog Posts
25 May 2017 | st marys, ga

Rig, Rain, Rearrangement

The mast work was almost done. The starboard upper shroud was removed and two 3/8" nylon thimbles were lashed with 7 strands of dynema 6 inches apart. One thimble was pinned to the tang on the mast, the other thimble had been carefully split at the teardrop end and fitted over the eye at the top end [...]

17 May 2017 | st marys, ga

Mo' Riggin'

The lack of internet in the boatyard makes ordering parts particularly difficult. The Google Chrome browser on my phone wants to autocomplete entries, but it goofs up, and shipping address becomes billing address. All the entries have to be painstakingly typed in on the little phone virtual keyboard [...]

15 May 2017 | st marys, ga

Catamaran Sophie's Launch

Here’s a link to photos of the launch of catamaran “Sophie” at St Marys Boat Services:

15 May 2017 | st marys, ga

Rigging

With the topsides painting completed work could commence on the rig. The chainplates were reattached to the hulls and now fittings for the stays had to be sussed out. The lashings of the past will be no more, I will be going back to turnbuckles with only lashings on one upper shroud to isolate it from [...]

13 May 2017 | st marys, ga

Chainplates

The punch list for getting the rig ready to restep the mast included torquing down the beam mounting bolts and installing the chainplates. It was important to check the beam mounting bolts because the rig pulls on the hulls and if the bolts are loose the hulls can become canted. Some of the rigging [...]

13 May 2017 | st marys, ga

Fairing and Painting Complete

The internet is still down in the boatyard, so posting the blog requires a ten mile drive for free wifi at Walmart, or at one of the lunch spots.

Hatches

18 December 2016 | St. Marys, GA
Capn Andy/Cold Fall Weather
Merry Christmas to me and to Kaimu. The fellow next door, Capn Bill, was carrying a large heavy box and I asked him what it was. It was a pair of Bomar hatches that he said were too big and he’d have to resell them. He bought them from eBay for a very low price. They fit a 25 1/2 inch square opening, so they are indeed large hatches. Tinted acrylic with cast aluminum frame, new old stock.
.
I was going to build new wood and acrylic hatches to replace those over the two twin bunks forward in each hull. The hatch opening is 24 inches. I took one of Bill’s hatches on board and laid it over the existing hatch. Nearly a perfect fit. I would have to trim about 1/2 inch all the way around the opening. I bought the hatches from Bill and gave him a little profit as well. Now all the money made on the yacht delivery was spent. The photo is of one of the hatches.
Comments
Gallery Error: Unknown Album [1:]:6137
Kaimu's Photos -

About & Links

SailBlogs Groups