Kaimusailing

s/v Kaimu Wharram Catamaran

Vessel Name: Kaimu
Vessel Make/Model: Wharram Custom
Hailing Port: Norwalk, CT
Crew: Andy and the Kaimu Crew
About: Sailors in the Baltimore, Annapolis, DC area.
24 March 2017 | St. Marys, GA
23 March 2017 | St. Marys, GA
20 March 2017 | St. Marys, GA
15 March 2017 | St. Marys, GA
05 March 2017 | St. Marys, GA
28 February 2017 | St. Marys, GA
24 February 2017 | St. Marys, GA
24 February 2017 | St. Marys, GA
24 February 2017 | St. Marys, GA
18 February 2017 | St. Marys, GA
11 February 2017 | St. Marys, GA
11 February 2017 | St. Marys, GA
09 February 2017 | St. Marys, GA
06 February 2017 | St. Marys, GA
31 January 2017 | St. Marys, GA
22 January 2017 | St. Marys, GA
12 January 2017 | St. Marys, GA
04 January 2017 | St Marys, GA
29 December 2016 | St. Marys, GA
26 December 2016 | St. Marys, GA
Recent Blog Posts
24 March 2017 | St. Marys, GA

French Toggles

The goal is to refinish the foredecks and the rest of the cabin sides by the end of the month. Some work on the outrigger canoe is being done at the same time.

23 March 2017 | St. Marys, GA

24 In. Multipurpose Trim Guard

I can tell when I have undesirable work ahead of me, I start doing everything else that I can think of. The hatch installation job was set aside so I could do something else, which turned out to be the proa, outrigger canoe, project. Now I had to get back to the hatches, but I still found other things [...]

20 March 2017 | St. Marys, GA

Birdseye View

It was time to return to working on the big catamaran and the installation of the new large Bomar hatches. I had cut out the hatch coamings to accept the new hatches and added new wood to the perimeter of the coamings to compensate for the wood removed. In order to get a perfect fit, I taped off the [...]

15 March 2017 | St. Marys, GA

BeamBrackets and Cold Snap

The remaining fiberglass work on the outrigger canoe included the underside of the inboard side deck and the bottom of the main hull. The inboard side deck already received a 3 foot wide fiberglass belt amidships and now only needed two 3 1/2 foot sections fore and aft to be completed. These are the [...]

05 March 2017 | St. Marys, GA

BFB Test Fit

The epoxy order was on its way so I used up the last little bit I had, priming the main hull’s decks and the bow compartments. The ama deck was primed and then I was out of epoxy.

28 February 2017 | St. Marys, GA

Side Deck Trouble

I had to order more epoxy, I was using it like a fiend. Laminating the hiking seat took 900 ml, about a quart, and that was only for the core. The two layers of fiberglass that wrap it will take as much or even more.

Hatches

18 December 2016 | St. Marys, GA
Capn Andy/Cold Fall Weather
Merry Christmas to me and to Kaimu. The fellow next door, Capn Bill, was carrying a large heavy box and I asked him what it was. It was a pair of Bomar hatches that he said were too big and he’d have to resell them. He bought them from eBay for a very low price. They fit a 25 1/2 inch square opening, so they are indeed large hatches. Tinted acrylic with cast aluminum frame, new old stock.
.
I was going to build new wood and acrylic hatches to replace those over the two twin bunks forward in each hull. The hatch opening is 24 inches. I took one of Bill’s hatches on board and laid it over the existing hatch. Nearly a perfect fit. I would have to trim about 1/2 inch all the way around the opening. I bought the hatches from Bill and gave him a little profit as well. Now all the money made on the yacht delivery was spent. The photo is of one of the hatches.
Comments
Gallery Error: Unknown Album [1:]:6137
Kaimu's Photos -

About & Links

SailBlogs Groups