Kaimusailing

s/v Kaimu Wharram Catamaran

Vessel Name: Kaimu
Vessel Make/Model: Wharram Custom
Hailing Port: Norwalk, CT
Crew: Andy and the Kaimu Crew
About: Sailors in the Baltimore, Annapolis, DC area.
25 May 2017 | st marys, ga
17 May 2017 | st marys, ga
15 May 2017 | st marys, ga
15 May 2017 | st marys, ga
13 May 2017 | st marys, ga
13 May 2017 | st marys, ga
13 May 2017 | st marys, ga
07 May 2017 | St. Marys, GA
07 May 2017 | St. Marys, GA
27 April 2017 | St. Marys, GA
26 April 2017 | St. Marys, GA
24 April 2017 | St. Marys, GA
24 April 2017 | St. Marys, GA
23 April 2017 | St. Marys, GA
20 April 2017 | St. Marys, GA
19 April 2017 | St. Marys, GA
18 April 2017 | St. Marys, GA
16 April 2017 | St. Marys, GA
14 April 2017 | St. Marys, GA
13 April 2017 | St. Marys, GA
Recent Blog Posts
25 May 2017 | st marys, ga

Rig, Rain, Rearrangement

The mast work was almost done. The starboard upper shroud was removed and two 3/8" nylon thimbles were lashed with 7 strands of dynema 6 inches apart. One thimble was pinned to the tang on the mast, the other thimble had been carefully split at the teardrop end and fitted over the eye at the top end [...]

17 May 2017 | st marys, ga

Mo' Riggin'

The lack of internet in the boatyard makes ordering parts particularly difficult. The Google Chrome browser on my phone wants to autocomplete entries, but it goofs up, and shipping address becomes billing address. All the entries have to be painstakingly typed in on the little phone virtual keyboard [...]

15 May 2017 | st marys, ga

Catamaran Sophie's Launch

Here’s a link to photos of the launch of catamaran “Sophie” at St Marys Boat Services:

15 May 2017 | st marys, ga

Rigging

With the topsides painting completed work could commence on the rig. The chainplates were reattached to the hulls and now fittings for the stays had to be sussed out. The lashings of the past will be no more, I will be going back to turnbuckles with only lashings on one upper shroud to isolate it from [...]

13 May 2017 | st marys, ga

Chainplates

The punch list for getting the rig ready to restep the mast included torquing down the beam mounting bolts and installing the chainplates. It was important to check the beam mounting bolts because the rig pulls on the hulls and if the bolts are loose the hulls can become canted. Some of the rigging [...]

13 May 2017 | st marys, ga

Fairing and Painting Complete

The internet is still down in the boatyard, so posting the blog requires a ten mile drive for free wifi at Walmart, or at one of the lunch spots.

Hiking Seat Components

24 February 2017 | St. Marys, GA
Capn Andy/mild winter
Here is a picture of the foam and wood bits that will form the hiking seat, with the ama behind them. The foam needed to have its plastic and aluminum skins removed. There is a thin 1/8" ply strip between each foam piece with poplar hardwood 1X2 on top and bottom.
Comments
Gallery Error: Unknown Album [1:]:6137
Kaimu's Photos -

About & Links

SailBlogs Groups