Work Still Progressing

28 March 2010
So I've almost got Kennisis ready for her maiden voyage (well... her maiden voyage for me). There is so much work still to do but having the structural elements of this project taken care of and being able to actually get her out on the water, raise the main, and see what I need/want to do with my standing and running rigging is a large mental mileston e

Bulkhead and Chainplate repair in progress

28 March 2010
Here is the offending chainplate and chainplate anchorpoint which is currently being repaired. I will next be adding fasteners to the buttblock (not visible) and breaking out the grinder again before adding more cloth.

Yet More Work

11 February 2010 | Seattle, WA
Forrest / Seattle-like
OK...
1) The Throttle/ Gearbox Morse Controller is installed and fully operational... feels like butter!
2) Roto-molded plastic water tank removed and new galley area prepped for new water-tanks.
3) Head cabinets removed and shower sump base cut in and ready for glasswork.
4) Existing ice-box is partially uninstalled (not demoed!)...
5) AC power relocated to the temporary location while:
6) Bulkhead is patched from the previous electrical installation.

Yeah!

Work Progresses

03 January 2010 | Seattle, WA
Work continues.... will add more to this soon, but setting this blog up will give me a place to put stuff...
Vessel Name: Kennisis
Vessel Make/Model: Morgan 30/2
Hailing Port: Seattle
Crew: Forrest Jackson
About: ...is getting Kennisis ready for traveling and is up to his eyeballs in epoxy, material, and equipment.
Extra: http://www.wadrocks.com

Kennisis Profile

Who: Forrest Jackson
Port: Seattle