Kormoran of Dart

and when she eventually gets to Cape Town, to be renamed......

13 January 2018 | cape town
15 April 2015 | cape town
16 October 2014 | cape town
16 October 2014 | cape town
15 October 2014 | cape town
24 September 2014 | cape town
14 July 2014 | cape town
05 July 2014 | cape town
16 June 2014 | cape town
05 June 2014 | Cape Town
12 March 2014 | cape town
04 February 2014 | cape town
29 October 2013 | Cape Town
02 September 2013 | cape town
18 August 2013 | cape town
13 July 2013 | cape town
01 June 2013 | cape Town
30 May 2013 | Cape Town
24 May 2013 | Cape Town
18 May 2013 | Cape Town

countdown....to late - it must happen now !

24 September 2014 | cape town
steve
Humble apologies to anyone who actually reads this drivel. I know, I havent been a good chap and updated for.....a while.

Over the last few weeks, all hell has broken loose !
Some good, some.....well, not so good.

Bottom line is that the tickets and accommodation has been booked and paid for; and not just for us, for the delivery crew as well !
There is no turning back......but then again, thats what we thought for 2 years running now !
29 October, we fly out !

So what has actually been happening. Phew, hard to explain.

The shaft is in, prop on. The motor is in and connected up.
Ok, so there is an engine mount still 'loose', and the shaft had to be machined as it was a fraction of a mm to big. But its all in now.
It was decided to leave the prop rope stripper/cutter as there wasnt enough space on the shaft....and the one that would fit was extremely expensive.

We have decided that the portholes can wait until in Cape Town, so thats 'off the list' for now.
The cockpit lids / seats have been done, the pedestal installed. Gas installation should be finished by end of the week. The autopilot has been tested and works. The radar has also been tested and seems to work but may require tuning. Electrical installation, barring a few fittings / bulbs, all work. Manfred the magician also thinks they found the electrolysis issue - a generator that had its earth /neutral mixed up....or something.

We have always known that there was a problem with the windlass - the previous owner told us about it and even sent the gears that required replacing. thank heaven we didnt spend money doing that - the whole....'frikkin'...motor was missing ! So we have had to replace that.
Why cant things be simple !!! Thanks to the 13mm chain and size of unit required etc, we have had to get a super duper heavy duty and expensive item.....but as the surveyor said....we will be very happy for this, of the coast, in a very big storm !

The rudder has been faired and the bottom painted. Eventually settled on SeaJet anti fouling, simply because it is available in Antigua and SA !

The 12v invertor packed up / became suspect, so has been replaced...or at least purchased and is still to be fitted. The last 4 batteries have started not holding their charge, so that has also been replaced.

The water heater piping was found to be 'not suitable' so has been replaced. Frikkin hell, thats expensive stuff !

The depth transducer wasnt working when connected up. Not a 'biggie'....until Manfred tried to get it out and put a new one in. Cut a long story, the sleeves had to be ground away so that the new transducer could be fitted with its securing nuts. Manfred reckons the original was simply 'siliconed' in with the lock nut left off because they couldnt access to tighten it up !

The sails have been checked, and only the staysail has gone to the sailmakers for repair.

The delivery skipper asks wether the fridge is working etc and what capacity it is. The reply I got from Antigua was classic - its working fine, and holds about 20 six packs of beer !

The rigger has been and done his thing ! Not perfect, but nothing serious. Some items will have to be attended to over the next 5 years. Primary items that are being dealt with now are the nav light lenses, a few swages and split pins.

We have decided that the bowsprit and cockpit teak will be redone in Cape Town. For the trip over the cockpit teak has been 'patched up', while the bowsprit has been left as is for now.

Any sort of drogue couldnt be found amongst all the shite, so we ordered a new Jordon Series Drogue. F--- Me George, a small fortune !
And then they found a large Gale Rider !! Oh well, rather to much than to little.

The brand new Epirb that we couriered to Antigua, together with the windlass gear...cannot be found ! Mmmm, not an easy issue to deal with !

In amongst all of this, the surveyor takes his family on holiday to see his folks....and his house burns down....and then gets ransacked ! They cut the holiday short and try pick up their lives again....while obnoxious shites like me are screaming blue murder if we dont make the deadline !
And a week or so after he gets back.....he comes down with Chikungunya disease !

Manfred gets back from 2 weeks leave on the 26th....and he then has about 3 days to finish the engine mounts, the exhaust pipework and the battery installation.
That will leave the surveyor about 9 days to do his survey and the sea trails. I must have the survey report etc by latest 09 Oct, to submit to SAMSA.

As for SAMSA......what a surprise !
Mid Aug, I called to remind them that I was still awaiting a reply to the application to appoint the surveyor. I am told that it is in process, and I will have a reply by end Aug !
About the 3rd Sept I email, kindly reminding them of the discussion, and asking what the status is. The following day, I receive the surveyors appointment letter....and about an hour later, another mail with all of the required documents and instructions etc, for registration !
So I push my luck, and ask whether this means I can change the name now, and not when the boat gets to cape Town. 'Sure, we suggest you complete the forms and send them in so we can check the database in the meantime'......done, dusted, now just waiting for the survey before I do the final application....!
What a pleasant surprise !

One item that is still.....'under investigation'.....is the Inmarsat terminal.
As far as we know it switches on etc, but we dont know if it actually works yet. In addition, it seems that the pc has also 'dissapeared', so we cant actually test the damn thing.
Running a macbook, also complicates matters as we need to find the correct cables and connectors etc....and then we arnt even sure wther it would 'talk' to each other.
So i eventually get hold of our 'service provider', Craig Jennings from Shevon Holdings. Never met him or anyone else from the company, but what a helpful person.
"No problem, just get the unit switched on, and we can run a few tests. Once we have done that we can tell you what state its in, and if it works, we can get you a pc all preconfigured so its 'plug and play'. You could use a mac, but its preferable to use a pc that is then a dedicated shipboard unit"....or something like that, he says.
My only issue is we already have Sailmail, and he recommnends Easymail.That could mean a 'loss' of a few thousand ZAR....which hurts....but then again, its a hell of a lot cheaper than renting or replacing.....yep, go Craig !
Just need to co-ordinate the guys in Antigua and the Shevon gents so we can do the tests : )

2 weeks to survey, sea trails and report completion !
Lets see if they make it !!!

5 weeks to departure

Excited (and........scared) we are !!!!

For pics see 'finishing 1' and 'finishing 2'
Comments
Vessel Name: Kormoran of Dart
Vessel Make/Model: Allan Pape 50 - currently undergoing a smallish refurb......
About: Steve - general layabout and occasional worker. Giselle - long suffering provider, home maker, wife and companion. Adam - the welp (who is coming into his own) !