Push to leave
31 October 2011 | Washington marina in DC
Steve
An up-date on the status of the new Living Well. We have replaced the side house windows (trim to come), new fuel tanks (4 @ 68 gals.), frigaboat fridge and freezer, new soundproofing in engine room, new inverter / charger, new 130 amp altenator / voltage regulator, remodel of galley, new paint on top of house and cockpit, radar arch built (start installation this week), davits built (start installation this week), new Lighthouse windlass (finish this week), wiring and bilge pumps, more to come tomorrow