|
30 April 2008
With the winter projects of, adding a heating system, replacing our chart plotter, replacing our auto pilot, adding a watermaker, replacing our water heater, repacking our shaft seal, cleaning & inspecting all through hull fittings, painting the bottom and waxing the top and sides nearly complete, Cool Breeze was lowered into the water today.
|