Mainsheet Track Installation
14 September 2012 | Auckland
Drilling the trackbolt holes straight. All went very well - looks pretty good from the inside as well.
What's been happening over the past month:
- Cule Hatches have been installed.
- Dorade Vents complete.
- Mainsheet Track finished.
- Anchor well hatch and washdown hatch installed.
- Anchor windlass in the process.
- Stanchions installed.
- Shower plumbing and hatch installed (cockpit).
- Steering Pedestal in place.
- Cockpit Access/Hatch being trimmed with Fijian Teak (Rosawa).