Not pretty
11 August 2008
The survey revealed a lot of work to do, some essential to ensure the boat was safe and seaworthy as well as a long list of mostly cosmetic items. Keeping the rain and sea spray out by replacing all the windows and sealing the leaks from the genoa tracks and stanchions would be a priority. After a full day with Capn Nic going over the whole boat, I ended up with an 80-point list of repair works. Time to talk to the marine engineers...