11/27/2009, Shell Island
Left Niceville for Hammockpoint on Thanksgiving, arrive there at 4:00 pm, had a nice dinner and crashed after sundowners. We woke up at 5:30 am, the outside temperature was 39, should have left in October. On top of that the engine would not crank over luckely the mecanic on board found a loose wire on the starter button. Got here at 3:30 There is a weather window to make the crossing to Clearwater, so we leave tomorrow.
|
|
01/31/2008, Niceville, Fl
We are making plans to cruise again, after a mayor overhaul (Pete). In about 3 weeks we are going to Arkabutla to finish the second stage of our barn/appartment project. After that we will have a better feel for a reallistic time table to finish prepairing Gull Wing to leave for Marathonon the end of October
|
|
