S/V CALLISTO - Great Lakes

Great Lakes

Vessel Name: CALLISTO
Vessel Make/Model: Tanzer 28
Hailing Port: Charlevoix, Michigan
Crew: None
Extra: Great Lakes
15 April 2012 | Charlevoix, MI
14 April 2012 | Charlevoix, MI
13 April 2012 | Charlevoix, MI
08 April 2012 | Charlevoix, MI
07 April 2012 | Charlevoix MI
06 April 2012 | Charlevoix MI
18 March 2012 | Charlevoix Michigan
17 March 2012 | Charlevoix MI
27 June 2011 | Charlevoix to Lake Charlevoix
26 June 2010 | Charlevoix to Lk. Michigan
23 May 2010 | St. James, Beaver Island to Charlevoix
22 May 2010 | Charlevoix to St. James, Beaver Island
15 May 2010 | Charlevoix to E. Shipping Lane
14 May 2010 | Charlevoix, MI
13 May 2010 | Charlevoix, MI
02 May 2010 | Charlevoix, MI
01 May 2010 | Charlevoix, MI
30 April 2010 | Charlevoix, MI
25 April 2010 | Charlevoix, MI
24 April 2010 | Charlevoix, MI
Recent Blog Posts
15 April 2012 | Charlevoix, MI

Fit out 2012

Install Fire Boy fixed fire system in engine room. Vacuum carpet.

14 April 2012 | Charlevoix, MI

Fit Out 2012

Remove rust blisters from keel. Touch up bottom paint. Replace starter solinoid. Replace solinoid ground wire with exisiting wire in harness "Relay DF" Test engine. Cranks over.

13 April 2012 | Charlevoix, MI

Fit Out 2012

Arrive aboard 22:00. Shore Power connected. Batt.1 on charge.

08 April 2012 | Charlevoix, MI

Fit Out 2012

Find location to mount Fire Boy fixed fire extinguising system in engine room. Too windy to paint bttom as I had planned today.

07 April 2012 | Charlevoix MI

Fit Out 2012

Replace washed curtains. Replaced fire extinguishers back from 12 year hydrotest. Replace washed linnen. Replaced and tested electronics. Test good.

06 April 2012 | Charlevoix MI

Fit Out 2012

2200 arrive aboard. Batt 1 on charge. Replace washed bedding.

Launch

14 May 2010 | Charlevoix, MI
Friday
Install Main Sail. No battins. Install Main Sail Cover. Replace worn 3/8" pin fom Boom gooseneck, with Stainless Steel 3/8" bolt. Too windy to install Main Sail battens and Head Sail. Will install Saturday, when wind dies down.
I.B.S. picked up Callisto at 10:05. Had her in the water by 11:25. No leaks. Shaft seal drip 2 per second. Normal for dry shaft seal.
Had trouble getting engine to idle and run under load. Engine stalled at last dock. Tried to get spring line out. Missed the cleat twice. I did not give myself enough line. Restarted the engine. Manuvered to Pump Out Dock. Wind was setting me into a bad situation. I nosed up to the dock. I swung the stern in a bit. As things were going. This plan would have gotten me along side the dock at the stern. Her bow would have been past the dock with not control.
I put Jack Klang'smethod into action. Not quite by the book. But close enough to work. I caught a cleat. Hauled in the spring line. Callisto nestled upto the dock nicely. Her bow still a good 3' from the end of the pier.
I brought the Head Sail (150 Gennoa) aboard. Along with a few other items.
I looked into the lackof power problem. I discovered the choke cable slipping. I set the position the the best performance. No hesitation under load.
Departed the marina. Caught the mooring on the first approach.
Comments

About & Links