Finally :-)

26 November 2015 | Peaks Yard Trinidad
25 November 2015 | Peaks Yard Trinidad
23 November 2015 | Peaks Yard Trinidad
22 November 2015 | Peaks Yard Trinidad
22 November 2015 | Peaks Yard Trinidad
21 November 2015 | Peaks Yard Trinidad
20 November 2015 | Peeak yard
18 November 2015 | Peaks Yard Trinidad
17 November 2015 | Peaks Yard Trinidad
16 November 2015 | Peaks Yard Trinidad
21 December 2014 | St Lcuia /Marigot Bay
25 November 2014 | Crews Inn Marina Chaguaramas
24 November 2014 | Peaks Yard Trinidad
22 November 2014 | Peaks Yard Trinidad
21 November 2014 | Peaks Yard Trinidad
20 November 2014 | Peaks Yard Trinidad
19 November 2014 | Peaks Yard Trinidad
17 November 2014 | Peaks Yard
17 November 2014 | Peak Yard Trinidad
17 November 2014 | Peaks Yard Trinidad

Rails are installed

23 November 2015 | Peaks Yard Trinidad
Georg Kohler
With the help of Antoni I installed the new alu rails today ..
First I had to jump a small hurdle as my drill would not allow me to drill the holes required to mount the rails.
The bow pulpit would just not levee enough room for normal drill.
I asked local Boat shop if they could send somebody out with angle drill - sure enough
the required 8 holes where drilled within 45 min - all for a total of 128 TT - amazing how it sometimes just works …

It took the two of us about 3 hours to install the two rails …
This means I can get my chain delivered tomorrow :-)

Also early in the mooring I dropped a sample of the coolant from my engine at the machine show (had to stuff it under the door as the guy came in late) When I called later he told me that I must have mixed up the yellow and the red coolant to get that color …
Not sure about this - for now the plan is to drain the coolant in Antigua and see what it looks like - if it comes out brownish again that heat exchanger will be opened ..