22 January 2025 | St. Marys, GA
15 January 2025 | St. Marys, GA
06 January 2025 | St. Marys, GA
24 December 2024 | St. Marys, GA
16 December 2024 | St. Marys, GA
02 December 2024 | St. Marys, GA
17 November 2024 | St. Marys, GA
31 October 2024 | Somers Cove, Crisfield, MD
10 October 2024 | Somers Cove, Crisfield, MD
03 October 2024 | Somers Cove, Crisfield, MD
24 September 2024 | Somers Cove, Crisfield, MD
13 September 2024 | Somers Cove, Crisfield, MD
09 September 2024 | Somers Cove, Crisfield, MD
04 September 2024 | Somers Cove, Crisfield, MD
28 August 2024 | Somers Cove, Crisfield, MD
21 August 2024 | Belmar Beach, NJ
11 August 2024 | Somers Cove, Crisfield, MD
24 July 2024 | Somers Cove Marina, Crisfield, MD
08 July 2024 | Somers Cove Marina, Crisfield, MD
25 June 2024 | Somers Cove, Crisfield, MD
D4 Dinghy Alternative Seats
01 March 2024 | St. Marys, GA
Cap'n Chef Andy | cold front rain wind
The rain event was more wind than rain, strong winds with gusts up to 44 mph. We drove into town to see what the harbor was like. There was a small sailboat that had dragged anchor and was sitting close to shore. The tide was out. We left and played with Bleu at Notter’s Pond.
.
Back at the boatyard I had to refasten a tarp. The wind was really howling.
.
Supplies were coming in for the dinghy project, epoxy, 1708 glass cloth, plastic syringes to measure epoxy, mini paint rollers, and a dozen multitool blades. Some of the items came from TEMU and cost a fraction of the prices at the local stores.
.
I glassed most of the exterior of the dinghy with 1708 and found it difficult to lay flat. Cutting darts in the cloth helped. The scissors soon became dull. I had to babysit the epoxy as it began to cure. I got most of it to stick and stay stuck.
.
The next part of the project was the seats. I was straying off the building plans now, I was making seats with similar shape to the Eastport Pram by Chesapeake Light Craft. Also I cut a curve into the top of the bow transom and a compound curve into the top of the stern transom. The Eastport Pram has beams under the seats to stiffen them. Also there is a daggerboard case that is part of the middle seat.
.
Next I laminated 1708 to the transoms inside and out. I found some scrap lumber from some long ago project. I made 1X3 seat crossbeams and two 1” wide cleats for the centerboard case. The cleats are spacers to hold the two sides of the centerboard case 1” apart. The centerboard case attaches to the middle seat seat beam and the seat is fastened atop.
.
The bow seat is actually a bow deck if you are building the dinghy rigged for sailing. It took a long time to shape it, compound angles all around. I contemplated putting a crown in the little deck but kept it flat.
.
The edges of the seats are curved. I used the angle grinder with a flap disc to round off the edge and smooth out the curves. I dry fitted the seats and beams and was ready to glue it all up when I remembered there are small wooden blocks underneath the ends of the seats and across the stern transom to support the rear seat. A cold front was approaching so I had a yardbird help me flip the dinghy upside down on the sawhorses. The bottom is glassed already so rain will not hurt it.
.
All the tools had to be put away under cover. While I was scurrying around doing that, the boatyard came and took away the gray Westsail 32 (nickname Wet Snail) to be put into the Travel Lift slings for launching. Now there was a big space between me and Komputer Ken, a space big enough for a certain catamaran, CATNAPPER, waiting for haul out.
.
Eloisa arrived just as I was about to call her and invite her to have dinner at the China Wok. She had never eaten there before. It has great food but the ambiance is of a take out place with just a couple booth tables. I had Hot and Spicy Shrimp and Hot and Sour Soup. Eloisa had Egg Foo Young and the soup with some spring rolls. We then left and had some wine and tea at Southern River Walk.
.
The night was chilly and rain was imminent. We will have a rain day and then get back on the dinghy project over the weekend. The image is of the dinghy with seats dry fitted in place.