No time wasted in getting started on the refit with the mast coming down last Friday and the engine coming out on Monday. The plan is to get Topaz Rival in the shed for the osmosis treatment as quickly as possible. All the bits and pieces from the boat have gone in to storage in Totnes so all the lockers are empty.
Mast down ready for the osmosis shed