Most of our work is done.
03 March 2018
We spent 3 days with the boat torn apart inside and in the cockpit getting the transducer from bow to the helm. On Friday the 16th we leave and head south towards Daytona. We head in off 95 to A1A and follow the coast back up. We can see some of the ocean and some of the ICW that we follow when travelling on the boat. Some beautiful scenery Saturday we finish with the transducer, it is finally all clipped in and the boat is straightened back up. Over the next few days we finish the drain in the keel, and get some teak work done inside.
Tuesday we go to St Augustine and get valves for the dingy, teak cleaner at West Marine and do some shopping. Back at the boat I start cleaning the teak seats outside. Wednesday we pick up Browns and go out for breakfast. The next day we go into town for a few things, stop to see Browns who are leaving tomorrow, then come back and finish putting on teak oil. The rest of the time has been spent doing small projects on the boat or just sitting out watching work going on in the yard.
It is Wednesday the 28th and last night David fell going over to the washroom around 2. He has road rash on both sides of his face, a gash over one eye, a sore wrist, scratches on both knees, plus a bruised finger and toe. He looks pretty bad. Today Saturday he is much better to look at and it really his wrist that is sore. Good thing most of our work is finished.
We are planning to leave here next Saturday.